MassVoter.com← Woburn City CouncilWoburn City Council · 2020–2021 Council · Regular meeting
86 recorded votes, 4 with disagreement.
Sources: Official minutes (PDF) · City meeting page
A monthly email on what it voted on, starting in November.
Present: Joanne E. Campbell, Robert J. Ferullo, Michael P. Concannon, Richard F. Gately, Joseph E. Demers, Michael Lannan, Jeffrey P. Dillon, Darlene Mercer-Bruen, Edward Tedesco
Absent: None
Dispense with the reading of the previous meeting's Journal and to approve
VOTED to dispense with the reading of the previous meeting's Journal and to APPROVE, all in favor, 9-0.
“VOTED to dispense with the reading of the previous meeting's Journal and to APPROVE, all in favor, 9-0..”
Any and all communication be received and made part of the permanent record — A communication dated November 18, 2021 was received from His Honor the Mayor Scott D. Galvin as follows: re: adoption...
Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0..”
The resolve be adopted — A communication dated November 18, 2021 was received from His Honor the Mayor Scott D. Galvin as follows: re: adoption of updated hazard mitigation plan for the city of...
Motion made and 2nd that the RESOLVE BE ADOPTED, all in favor, 9-0.
“Motion made and 2nd that the RESOLVE BE ADOPTED, all in favor, 9-0..”
The matter be referred to the Committee on Public Safety and License — Petition by dcd Nucar woma, LLC, 40 Winn Street, for renewal of First Class Motor Vehicles Sales License
Motion made and 2nd that the MATTER BE REFERRED TO THE COMMITTEE ON PUBLIC SAFETY AND LICENSE, all in favor, 8-0-1 (Lannan Abstained).
Yes: Campbell, Concannon, Demers, Dillon, Ferullo, Gately, Mercer-Bruen, TedescoAbstained: Lannan
“Motion made and 2nd that the MATTER BE REFERRED TO THE COMMITTEE ON PUBLIC SAFETY AND LICENSE, all in favor, 8-0-1 (Lannan Abstained)..”
The matter be referred to the Committee on Public Safety and License — Petitions for renewal of Second Class Motor Vehicles Sales Licenses by the following: Donald J. Socorelis dba Woburn Glass...
Motion made and 2nd that the MATTER BE REFERRED TO THE COMMITTEE ON PUBLIC SAFETY AND LICENSE, all in favor, 9-0.
“Motion made and 2nd that the MATTER BE REFERRED TO THE COMMITTEE ON PUBLIC SAFETY AND LICENSE, all in favor, 9-0..”
The matter be referred to public hearing — Petition by National Grid for a grant of right in a way to install a new 4-inch-high pressure gas main to replace an existing low pressure gas main along...
Motion made and 2nd that the MATTER BE REFERRED TO PUBLIC HEARING, all in favor, 9-0.
“Motion made and 2nd that the MATTER BE REFERRED TO PUBLIC HEARING, all in favor, 9-0..”
The matter be referred to public hearing — Petition by NStar Electric Company, d/b/a Eversource Energy for grant of right in a way to install approximately 962 feet of conduit and one new manhole,...
Motion made and 2nd that the MATTER BE REFERRED TO PUBLIC HEARING, all in favor, 9-0.
“Motion made and 2nd that the MATTER BE REFERRED TO PUBLIC HEARING, all in favor, 9-0..”
Accept the return receipt green cards
Motion made and 2nd to accept the return receipt green cards, all in favor, 9-0.
“Motion made and 2nd to accept the return receipt green cards, all in favor, 9-0..”
The public hearing be opened for public comments — On the petition by Montvale Auto Care, 317 Montvale Avenue, Woburn, Massachusetts, 01801 for a new inflammable license, for 1,045 gallons of...
Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0.
“Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0..”
The public hearing be closed — On the petition by Montvale Auto Care, 317 Montvale Avenue, Woburn, Massachusetts, 01801 for a new inflammable license, for 1,045 gallons of Class I oil in 55 gallon...
Motion made and 2nd that the public hearing be closed, all in favor, 9-0.
“Motion made and 2nd that the public hearing be closed, all in favor, 9-0..”
Grant the inflammable license and to send a communication to the fire department regarding the new license
Motion made and 2nd to grant the inflammable license and to send a communication to the fire department regarding the new license, all in favor, 9-0.
“Motion made and 2nd to grant the inflammable license and to send a communication to the fire department regarding the new license, all in favor, 9-0..”
Any and all communication be received and made part of the permanent record — On the petition by The Chateau Restaurant of Woburn, Inc., 195 School Street, Waltham, Massachusetts 02451, for...
Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0..”
The documents be received and made part of the permanent record — On the petition by The Chateau Restaurant of Woburn, Inc., 195 School Street, Waltham, Massachusetts 02451, for special permit...
Motion made and 2nd that the documents be received and made part of the permanent record, all in favor, 9- 0.
“Motion made and 2nd that the documents be received and made part of the permanent record, all in favor, 9- 0..”
The public hearing be opened for public comments — On the petition by The Chateau Restaurant of Woburn, Inc., 195 School Street, Waltham, Massachusetts 02451, for special permit pursuant to the...
Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0.
“Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0..”
The public hearing be closed — On the petition by The Chateau Restaurant of Woburn, Inc., 195 School Street, Waltham, Massachusetts 02451, for special permit pursuant to the 1985 City of Woburn...
Motion made and 2nd that the public hearing be closed, all in favor, 9-0.
“Motion made and 2nd that the public hearing be closed, all in favor, 9-0..”
Grant the special permit with the following conditions: 1. Both pylon signs shall be installed substantially as shown on the plans filed with the Special Permit Petition; and 2. The text and...
Motion made and 2nd to grant the special permit with the following conditions: 1. Both pylon signs shall be installed substantially as shown on the plans filed with the Special Permit Petition; and 2. The text and illumination in both pylon signs shall be steady and stationary at all times, all in favor, 9-0.
“Motion made and 2nd to grant the special permit with the following conditions: 1. Both pylon signs shall be installed substantially as shown on the plans filed with the Special Permit Petition; and 2. The text and illumination in both pylon signs shall be steady and stationary at all times, all in favor, 9-0..”
Any and all communication be received and made part of the permanent record — On the petition by NStar Electric Company, d/b/a Eversource Energy, and Verizon, New England Inc. for grant of right...
Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0..”
The public hearing be opened for public comments — On the petition by NStar Electric Company, d/b/a Eversource Energy, and Verizon, New England Inc. for grant of right in a way to install...
Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0.
“Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0..”
The public hearing be closed — On the petition by NStar Electric Company, d/b/a Eversource Energy, and Verizon, New England Inc. for grant of right in a way to install approximately 60 feet of...
Motion made and 2nd that the PUBLIC HEARING BE CLOSED, all in favor, 9-0.
“Motion made and 2nd that the PUBLIC HEARING BE CLOSED, all in favor, 9-0..”
Grant the right in A way pursuant to the DPW Superintendent's communication dated November 15, 2021 as follows: 1. Water and sewer mains and services should be clearly located prior to any...
Motion made and 2nd to GRANT THE RIGHT IN A WAY pursuant to the DPW Superintendent's communication dated November 15, 2021 as follows: 1. Water and sewer mains and services should be clearly located prior to any installation of the pole, which may require sewer video be performed; 2. The petitioner will mill out a minimum of 25 feet from each side of the trench limits, curb to curb, and repaving this with 2 inches bituminous concrete after a minimum of 90 days of settlement; and 3. Eversource should obtain a street opening permit and post a Performance Bond to ensure the referenced restoration work is performed, all in favor, 9-0.
“Motion made and 2nd to GRANT THE RIGHT IN A WAY pursuant to the DPW Superintendent's communication dated November 15, 2021 as follows: 1. Water and sewer mains and services should be clearly located prior to any installation of the pole, which may require sewer video be performed; 2. The petitioner will mill out a minimum of 25 feet from each side of the trench limits, curb to curb, and repaving this with 2 inches bituminous concrete after a minimum of 90 days of settlement; and 3. Eversource should obtain a street opening permit and post a Performance Bond to ensure the referenced restoration work is performed, all in favor, 9-0..”
Any and all communication be received and made part of the permanent record — On the petition by NStar Electric Company, d/b/a Eversource Energy, and Verizon, New England Inc. for grant of right...
Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0..”
The public hearing be opened for public comments — On the petition by NStar Electric Company, d/b/a Eversource Energy, and Verizon, New England Inc. for grant of right in a way to install one new...
Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0.
“Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0..”
The public hearing be closed — On the petition by NStar Electric Company, d/b/a Eversource Energy, and Verizon, New England Inc. for grant of right in a way to install one new pole 582/6B on Gill...
Motion made and 2nd that the PUBLIC HEARING BE CLOSED, all in favor, 9-0.
“Motion made and 2nd that the PUBLIC HEARING BE CLOSED, all in favor, 9-0..”
Grant the right in A way pursuant to the DPW Superintendent's communication dated November 15, 2021 as follows: 1. Water and sewer mains and services should be clearly located prior to any...
Motion made and 2nd to GRANT THE RIGHT IN A WAY pursuant to the DPW Superintendent's communication dated November 15, 2021 as follows: 1. Water and sewer mains and services should be clearly located prior to any installation of the pole, which may require sewer video be performed; 2. The petitioner will mill out a minimum of 25 feet from each side of the trench limits, curb to curb, and repaving this with 2 inches bituminous concrete after a minimum of 90 days of settlement; and 3. Eversource should obtain a street opening permit and post a Performance Bond to ensure the referenced restoration work is performed, all in favor, 9-0.
“Motion made and 2nd to GRANT THE RIGHT IN A WAY pursuant to the DPW Superintendent's communication dated November 15, 2021 as follows: 1. Water and sewer mains and services should be clearly located prior to any installation of the pole, which may require sewer video be performed; 2. The petitioner will mill out a minimum of 25 feet from each side of the trench limits, curb to curb, and repaving this with 2 inches bituminous concrete after a minimum of 90 days of settlement; and 3. Eversource should obtain a street opening permit and post a Performance Bond to ensure the referenced restoration work is performed, all in favor, 9-0..”
The public hearing be opened for public comments — On the petition by President Tedesco, Councilor Ferullo, and Councilor Demers to amend the 1985 Woburn Zoning Ordinances, as amended, be further...
Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0.
“Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0..”
The public hearing be continued to the regular meeting of the City Council on December 21, 2021, and referred the matter to the Committee on Ordinance, Charter and Rules — On the petition by...
Motion made and 2nd that the PUBLIC HEARING BE CONTINUED TO THE REGULAR MEETING OF THE CITY COUNCIL ON December 21, 2021, and referred the matter to the Committee on Ordinance, Charter and Rules, all in favor, 9-0.
“Motion made and 2nd that the PUBLIC HEARING BE CONTINUED TO THE REGULAR MEETING OF THE CITY COUNCIL ON December 21, 2021, and referred the matter to the Committee on Ordinance, Charter and Rules, all in favor, 9-0..”
Any and all communication be received and made part of the permanent record — On the petition by tdc Development Group, LLC, 125 High Street, Boston, Massachusetts 02110, to amend the 1985 Woburn...
Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 8-1 (Tedesco Opposed).
Yes: Campbell, Concannon, Demers, Dillon, Ferullo, Gately, Lannan, Mercer-BruenNo: Tedesco
“Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 8-1 (Tedesco Opposed)..”
The public hearing be opened for public comments — On the petition by tdc Development Group, LLC, 125 High Street, Boston, Massachusetts 02110, to amend the 1985 Woburn Zoning Ordinances, as...
Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0.
“Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0..”
The matter be referred to the Committee on Ordinance, Charter and Rules, and that the public hearing be continued to the regular meeting of the City Council on December 21, 2021 — On the petition...
Motion made and 2nd the matter be referred to the Committee on Ordinance, Charter and Rules, and that the PUBLIC HEARING BE CONTINUED TO THE REGULAR MEETING OF THE CITY COUNCIL ON December 21, 2021, all in favor, 9-0.
“Motion made and 2nd the matter be referred to the Committee on Ordinance, Charter and Rules, and that the PUBLIC HEARING BE CONTINUED TO THE REGULAR MEETING OF THE CITY COUNCIL ON December 21, 2021, all in favor, 9-0..”
The committee report be received and made part of the permanent record — On the petition by continuus Pharmaceuticals, Inc. c/o Ernest Penachio, 25-R Olympia Avenue, Woburn, Massachusetts 01801...
Motion made and 2nd that the committee report be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that the committee report be received and made part of the permanent record, all in favor, 9-0..”
The proposed conditions be received and made part of the permanent record
Motion made and 2nd that the proposed conditions be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that the proposed conditions be received and made part of the permanent record, all in favor, 9-0..”
Any and all communication be received and made part of the permanent record — On the petition by continuus Pharmaceuticals, Inc. c/o Ernest Penachio, 25-R Olympia Avenue, Woburn, Massachusetts...
Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0..”
Amend Condition No. 16 to the add ", which will be installed by the petitioner,"
Motion made and 2nd to amend Condition No. 16 to the add ", which will be installed by the petitioner,", all in favor, 9-0.
“Motion made and 2nd to amend Condition No. 16 to the add ", which will be installed by the petitioner,", all in favor, 9-0..”
Condition 16 be amended to add "The sign will be installed upon the issuance of a building permit."
Motion made and second that Condition 16 be amended to add "The sign will be installed upon the issuance of a building permit.", all in favor, 9-0.
“Motion made and second that Condition 16 be amended to add "The sign will be installed upon the issuance of a building permit.", all in favor, 9-0..”
The public hearing be opened for public comments — On the petition by continuus Pharmaceuticals, Inc. c/o Ernest Penachio, 25-R Olympia Avenue, Woburn, Massachusetts 01801 for special permit to...
Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9- 0.
“Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9- 0..”
The public hearing be closed — On the petition by continuus Pharmaceuticals, Inc. c/o Ernest Penachio, 25-R Olympia Avenue, Woburn, Massachusetts 01801 for special permit to allow: 1
Motion made and 2nd that the PUBLIC HEARING BE CLOSED, all in favor, 9-0.
“Motion made and 2nd that the PUBLIC HEARING BE CLOSED, all in favor, 9-0..”
Adopt the committee report and grant the special permit with the 17 conditions, as amended, as follows: 1. The Applicant shall construct and improve the site as substantially described in the...
Motion made and 2nd to ADOPT THE COMMITTEE REPORT AND GRANT THE SPECIAL PERMIT WITH THE 17 CONDITIONS, as amended, as follows: 1. The Applicant shall construct and improve the site as substantially described in the plans submitted with the Special Permit Application entitled: "GMP Plant Project", 32 Cabot Road, Woburn, Massachusetts consisting of Sheet C0.0 dated July 6, 2021, revised October 22, 2021; Sheet C1.1 dated July 6, 2021, revised August 4, 2021; revised October 5, 2021; revised October 22, 2021; Sheet C2.1 dated July 6, 2021, revised August 4, 2021; revised October 5, 2021; revised October 22, 2021; Sheet C3.1 dated July 6, 2021, revised August 4, 2021; revised October 5, 2021; revised October 22, 2021; Sheet C4.1 dated July 6, 2021, revised August 4, 2021; revised October 5, 2021; revised October 22, 2021; Sheet C5.1 dated July 6, 2021, revised August 4, 2021; revised October 5, 2021; revised October 22, 2021; Sheet C5.2 dated July 6, 2021, revised August 4, 2021; revised October 5, 2021; revised October 22, 2021; Sheet C5.3 dated July 6, 2021, revised August 4, 2021; revised October 5, 2021; revised October 22, 2021; prepared by Pare Corporation, 8 Blackstone Valley Place, Lincoln, RI 02865 (hereinafter the "Site Plan") although design adjustments and modifications generally associated with: (i) preparing so-called "working drawings" or (ii) site conditions shall be permitted so long as such changes do not constitute substantial changes from said plans as determi
“Motion made and 2nd to ADOPT THE COMMITTEE REPORT AND GRANT THE SPECIAL PERMIT WITH THE 17 CONDITIONS, as amended, as follows: 1. The Applicant shall construct and improve the site as substantially described in the plans submitted with the Special Permit Application entitled: "GMP Plant Project", 32 Cabot Road, Woburn, Massachusetts consisting of Sheet C0.0 dated July 6, 2021, revised October 22, 2021; Sheet C1.1 dated July 6, 2021, revised August 4, 2021; revised October 5, 2021; revised October 22, 2021; Sheet C2.1 dated July 6, 2021, revised August 4, 2021; revised October 5, 2021; revised October 22, 2021; Sheet C3.1 dated July 6, 2021, revised August 4, 2021; revised October 5, 2021; revised October 22, 2021; Sheet C4.1 dated July 6, 2021, revised August 4, 2021; revised October 5, 2021; revised October 22, 2021; Sheet C5.1 dated July 6, 2021, revised August 4, 2021; revised October 5, 2021; revised October 22, 2021; Sheet C5.2 dated July 6, 2021, revised August 4, 2021; revised October 5, 2021; revised October 22, 2021; Sheet C5.3 dated July 6, 2021, revised August 4, 2021; revised October 5, 2021; revised October 22, 2021; prepared by Pare Corporation, 8 Blackstone Valley Place, Lincoln, RI 02865 (hereinafter the "Site Plan") although design adjustments and modifications generally associated with: (i) preparing so-called "working drawings" or (ii) site conditions shall be permitted so long as such changes do not constitute substantial changes from said plans as determined by the Building Commissioner. In the event that the Building Commissioner determines that the building plans filed with the Building Permit Application are not in substantial conformance with the Site Plan, the Applicant may request a review of said plans by the City Council Special Permits Committee who shall make a final determination. If the Special Permits Committee makes a determination that the proposed plans are not in conformance with the Site Plan, the Applicant shall be required to file a Special Permit Petition seeking approval to modify the Site Plan; 2. There shall be adequate rodent control in place prior to commencement of any site disturbance and maintained throughout all site development and construction phases. The Applicant shall provide monthly rodent control reports to both the Board of Health and the Department of Inspectional Services; 3. Prior to the issuance of a Building Permit, the Applicant shall file a snow storage and removal plan with the Department of Inspectional Services; 4. All dumpsters, if any, shall be enclosed, by means of a fence, wall or landscaping in compliance with the Woburn Zoning Ordinance and Title 8 Section VII 8-17 of the Woburn Municipal Code. In addition rodent control measures in connection with any dumpsters shall be in place and maintained; 5. As-built plans shall be provided at the conclusion of the project to the satisfaction of the Engineering Department and Department of Inspectional Services. In addition, the Applicant shall provide interim as-built plans as required during permitting coordination with the City Engineer and Building Commissioner; 6. The Project is contingent upon the issuance of an Order of Conditions by the Woburn Conservation Commission (and/or Superseding Order of Conditions issued by MassDEP) pursuant to the Massachusetts Wetlands Protection Act, and implementing regulations (310 CMR 10.00 et seq.). Any material changes required in the Project as a result of the issuance of an Order of Conditions, shall be reviewed by the City Council pursuant to Condition One; 7. The Applicant shall submit monthly construction reports to the City Council, Building Commissioner, City Engineer, Fire Department and Conservation Commission; 8. A Dust Management/Mitigation plan for dust control during all phases of sitework/ construction shall be filed with the Department of Inspectional Services; 9. The final design(s) of all water connection(s) must be approved by the Department of Public Works and Water Superintendent, and installations of same are subject to the issuance of water connection permits by that Department; 10. If any changes are made to the proposed gas service and those changes require excavations in either Cabot Road or Commerce Way, the Petitioner (Continuus Pharmaceuticals, Inc.) shall be responsible for the costs of repaving and restoring either or both roadways to the satisfaction of the DPW Director; 11. Following installation of water services, the Petitioner shall mill (two [2] inches) and install a pavement overlay on the disturbed portion of Cabot Road in order to restore it to pre-construction condition. The minimum limit of area to be restored is shown in gray shading within Cabot Road right-of- way layout on Sheets C3.1 and C4.1 of the above-referenced plan set; 12. The words "NO PARKING" must be stenciled on the pavement along the curb line between the double Dumpster pad and the generator to its northeast, and at least two "NO PARKING" signs complaint with the Manual of Uniform Traffic Control Devices (MUTCD) shall be erected in the same location; 13. Prior to the issuance of a building permit the Applicant shall provide to the Department of Inspectional Services a HazMat Security Plan and a Building Occupancy Plan; 14. The Applicant shall meet with the Fire Department to finalize an emergency response contingency plan prior to occupying the Building; 15. The storage, disposal and containment protection of all waste materials shall comply with all applicable laws and codes to the reasonable satisfaction of the Woburn Fire Department; 16. As mitigation for this proposal the Petitioner shall make a monetary contribution of $25,000.00 for the installation of a flashing speed sign or a flashing pedestrian crossing light, which will be installed by the petitioner, at the corner of Washington Circle and Mill Street. Any excess funds shall be applied to traffic improvements along Commerce Way. The sign will be installed upon the issuance of a building permit; and 17. No building permits or any other required permits that may be necessary for the site will issue for any additions or exterior work on the premises as shown on the Site Plan until all FEMA matters have been resolved with copies of any approvals from FEMA to be provided to the Building Commissioner by the Petitioner, all in favor, 9-0..”
Any and all communication be received and made part of the permanent record — On the petition by Jackson Lumber, 10 Jefferson Avenue, Woburn, Massachusetts 01801 for special permit pursuant to...
Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0..”
The public hearing be opened for public comments — On the petition by Jackson Lumber, 10 Jefferson Avenue, Woburn, Massachusetts 01801 for special permit pursuant to 1985 Woburn Zoning Ordinances,...
Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0.
“Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0..”
The public hearing be closed — On the petition by Jackson Lumber, 10 Jefferson Avenue, Woburn, Massachusetts 01801 for special permit pursuant to 1985 Woburn Zoning Ordinances, as amended,...
Motion made and 2nd that the PUBLIC HEARING BE CLOSED, all in favor, 9-0.
“Motion made and 2nd that the PUBLIC HEARING BE CLOSED, all in favor, 9-0..”
Deny the special permit — On the petition by Jackson Lumber, 10 Jefferson Avenue, Woburn, Massachusetts 01801 for special permit pursuant to 1985 Woburn Zoning Ordinances, as amended, Sections 7.5...
Motion made and 2nd to DENY THE SPECIAL PERMIT, ROLL CALL: Campbell - Yes; Concannon - Yes; Demers - Yes, Dillon - Yes; Ferullo - Yes; Gately - Yes; Lannan - Yes; Mercer-Bruen - Yes; Tedesco - Yes. MOTION PASSES.
“Motion made and 2nd to DENY THE SPECIAL PERMIT, ROLL CALL: Campbell - Yes; Concannon - Yes; Demers - Yes, Dillon - Yes; Ferullo - Yes; Gately - Yes; Lannan - Yes; Mercer-Bruen - Yes; Tedesco - Yes. MOTION PASSES..”
Take a five-minute recess
Motion made and 2nd to take a five-minute recess, all in favor, 9-0.
“Motion made and 2nd to take a five-minute recess, all in favor, 9-0..”
Return to the regular order of business
Motion made and 2nd to return to the regular order of business, all in favor, 9-0.
“Motion made and 2nd to return to the regular order of business, all in favor, 9-0..”
Any and all communication be received and made part of the permanent record — On the petition by Lawless Inc., 196 Lexington Street, Woburn, Massachusetts 01801, for a special permit request that...
Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0..”
The documents be received and made part of the permanent record — On the petition by Lawless Inc., 196 Lexington Street, Woburn, Massachusetts 01801, for a special permit request that the...
Motion made and 2nd that the documents be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that the documents be received and made part of the permanent record, all in favor, 9-0..”
The public hearing be opened for public comments — On the petition by Lawless Inc., 196 Lexington Street, Woburn, Massachusetts 01801, for a special permit request that the Landowner's Decision...
Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0.
“Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0..”
The public hearing be closed — On the petition by Lawless Inc., 196 Lexington Street, Woburn, Massachusetts 01801, for a special permit request that the Landowner's Decision and Notice of Special...
Motion made and 2nd that the PUBLIC HEARING BE CLOSED, all in favor, 9-0.
“Motion made and 2nd that the PUBLIC HEARING BE CLOSED, all in favor, 9-0..”
Deny the special permit — On the petition by Lawless Inc., 196 Lexington Street, Woburn, Massachusetts 01801, for a special permit request that the Landowner's Decision and Notice of Special...
Motion made and 2nd to DENY THE SPECIAL PERMIT, ROLL CALL: Campbell - Yes; Concannon - Yes; Demers - Yes, Dillon - Yes; Ferullo - Yes; Gately - Yes; Lannan - Yes; Mercer-Bruen - Yes; Tedesco - Yes. MOTION PASSES.
“Motion made and 2nd to DENY THE SPECIAL PERMIT, ROLL CALL: Campbell - Yes; Concannon - Yes; Demers - Yes, Dillon - Yes; Ferullo - Yes; Gately - Yes; Lannan - Yes; Mercer-Bruen - Yes; Tedesco - Yes. MOTION PASSES..”
Any and all communication be received and made part of the permanent record — On the petition by Lawless Inc., 196 Lexington Street, Woburn, Massachusetts 01801, for a special permit pursuant to...
Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0..”
The documents be received and made part of the permanent record — On the petition by Lawless Inc., 196 Lexington Street, Woburn, Massachusetts 01801, for a special permit pursuant to Section 7.3...
Motion made and 2nd that the documents be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that the documents be received and made part of the permanent record, all in favor, 9-0..”
Add Condition No. 10 as follows "There shall be no construction vehicles parking on Lexington Street. A construction vehicle parking plan shall be submitted to the Building Department."
Motion made and 2nd to add Condition No. 10 as follows "There shall be no construction vehicles parking on Lexington Street. A construction vehicle parking plan shall be submitted to the Building Department.", all in favor, 9-0.
“Motion made and 2nd to add Condition No. 10 as follows "There shall be no construction vehicles parking on Lexington Street. A construction vehicle parking plan shall be submitted to the Building Department.", all in favor, 9-0..”
The public hearing be opened for public comments — On the petition by Lawless Inc., 196 Lexington Street, Woburn, Massachusetts 01801, for a special permit pursuant to Section 7.3 and Site Plan...
Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0.
“Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0..”
The documents from Mr. Devine be received and made part of the permanent record — On the petition by Lawless Inc., 196 Lexington Street, Woburn, Massachusetts 01801, for a special permit pursuant...
Motion made and 2nd that the documents from Mr. Devine be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that the documents from Mr. Devine be received and made part of the permanent record, all in favor, 9-0..”
Take a five-minute recess
Motion made and 2nd to take a five-minute recess, all in favor, 9-0.
“Motion made and 2nd to take a five-minute recess, all in favor, 9-0..”
Return to the regular order of business
Motion made and 2nd to return to the regular order of business, all in favor, 9-0.
“Motion made and 2nd to return to the regular order of business, all in favor, 9-0..”
Amend Condition No. 10 "nor at the George I. Campbell American Legion."
Motion made and 2 nd to amend Condition No. 10 "nor at the George I. Campbell American Legion.", all in favor, 9-0.
“Motion made and 2 nd to amend Condition No. 10 "nor at the George I. Campbell American Legion.", all in favor, 9-0..”
Close the public hearing — On the petition by Lawless Inc., 196 Lexington Street, Woburn, Massachusetts 01801, for a special permit pursuant to Section 7.3 and Site Plan Review under Section 12 of...
Motion made and 2nd to close the public hearing, all in favor, 9-0.
“Motion made and 2nd to close the public hearing, all in favor, 9-0..”
Approve the special permit with the 10 Conditions, as amended, as follows: 1. The Plan of Record shall be the plan entitled "Site Development Plans For Building Addition, 196 Lexington Street,...
Motion made and 2nd to approve the special permit with the 10 Conditions, as amended, as follows: 1. The Plan of Record shall be the plan entitled "Site Development Plans For Building Addition, 196 Lexington Street, Woburn, Massachusetts dated September 30, 2021, revised October 6, 2021, revised November 30, 2021; Sheet V-101 dated September 30, 2021; Sheet C-001 dated September 30, 2021; Sheet C-002 dated September 30, 2021; Sheet C-101 dated September 30, 2021; Sheet C-102 dated September 30, 2021, revised October 6, 2021, revised November 30, 2021; Sheet C-103 dated September 30, 2021; Sheet C-104 dated September 30, 2021; Sheet C-501 dated September 30, 2021; Sheet 502 dated September 30, 2021; Sheet C-502 dated September 30, 2021" prepared by Allen & Major Associates, 100 Commerce Way, Woburn, MA 01801 (the "Plan"); 2. Except as modified by this Decision, all conditions set forth in the Special Permit Decision dated June 14, 2005 shall remain in full force and effect; 3. Car carriers are prohibited from unloading vehicles on public streets including but not limited to Lexington Street and Mayflower Road; 4. All onsite lighting fixtures, including but not limited to building and pole mounted fixtures, will be Dark Sky compliant and shielded to minimize excess light glare toward abutting properties; 5. Construction work on the exterior of the site shall be from 7:00 a.m. - 6:00 p.m. Monday through Friday, and 8:00 a.m. - 5:00 p.m. on Saturdays. No work on the exterior of t
The journal gives the count as 8-0-1 and names Jeffrey P. Dillon (no), which does not add up with the nine members on the roll call (Joanne E. Campbell, Robert J. Ferullo, Michael P. Concannon, Richard F. Gately, Joseph E. Demers, Michael Lannan, Jeffrey P. Dillon, Darlene Mercer-Bruen and Edward Tedesco). Showing the count only.
“Motion made and 2nd to approve the special permit with the 10 Conditions, as amended, as follows: 1. The Plan of Record shall be the plan entitled "Site Development Plans For Building Addition, 196 Lexington Street, Woburn, Massachusetts dated September 30, 2021, revised October 6, 2021, revised November 30, 2021; Sheet V-101 dated September 30, 2021; Sheet C-001 dated September 30, 2021; Sheet C-002 dated September 30, 2021; Sheet C-101 dated September 30, 2021; Sheet C-102 dated September 30, 2021, revised October 6, 2021, revised November 30, 2021; Sheet C-103 dated September 30, 2021; Sheet C-104 dated September 30, 2021; Sheet C-501 dated September 30, 2021; Sheet 502 dated September 30, 2021; Sheet C-502 dated September 30, 2021" prepared by Allen & Major Associates, 100 Commerce Way, Woburn, MA 01801 (the "Plan"); 2. Except as modified by this Decision, all conditions set forth in the Special Permit Decision dated June 14, 2005 shall remain in full force and effect; 3. Car carriers are prohibited from unloading vehicles on public streets including but not limited to Lexington Street and Mayflower Road; 4. All onsite lighting fixtures, including but not limited to building and pole mounted fixtures, will be Dark Sky compliant and shielded to minimize excess light glare toward abutting properties; 5. Construction work on the exterior of the site shall be from 7:00 a.m. - 6:00 p.m. Monday through Friday, and 8:00 a.m. - 5:00 p.m. on Saturdays. No work on the exterior of the site shall be permitted on Sunday, or state and federal holidays recognized by the City of Woburn; 6. There shall be adequate rodent control in place prior to commencement of any site disturbance and maintained throughout all site development and construction phases. The Applicant shall provide monthly rodent control reports to both the Board of Health and the Department of Inspectional Services; 7. As-built plans shall be provided at the conclusion of the project to the satisfaction of the Engineering Department and Department of Inspectional Services. In addition, the Applicant shall provide interim as-built plans as required during permitting coordination with the City Engineer and Building Commissioner; 8. A Dust Management/Mitigation plan for dust control during all phases of sitework/ construction shall be filed with the Department of Inspectional Services; 9. The exterior design of the buildings and all signage shall be substantially as shown on the architectural plans entitled Exterior Elevations, dated September 30, 2021 and November 29, 2021 and proposed by Praxis 3 Design and Jewett Construction; and 10. There shall be no construction vehicles parking on Lexington Street nor at the George I. Campbell American Legion. A construction vehicle parking plan shall be submitted to the Building Department., all in favor, 8-0-1 (Dillon Opposed)..”
Any and all communication be received and made part of the permanent record — On the petition by Montvale Land LLC for approval of amended Master Concept Plan pursuant to Section 28.4.3 of the...
Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0..”
The documents be received and made part of the permanent record — On the petition by Montvale Land LLC for approval of amended Master Concept Plan pursuant to Section 28.4.3 of the City of Woburn...
Motion made and 2nd that the documents be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that the documents be received and made part of the permanent record, all in favor, 9-0..”
The public hearing be opened for public comments — On the petition by Montvale Land LLC for approval of amended Master Concept Plan pursuant to Section 28.4.3 of the City of Woburn Zoning...
Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0.
“Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0..”
The documents be received and made part of the permanent record — On the petition by Montvale Land LLC for approval of amended Master Concept Plan pursuant to Section 28.4.3 of the City of Woburn...
Motion made and 2nd that the documents be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that the documents be received and made part of the permanent record, all in favor, 9-0..”
The public hearing be closed — On the petition by Montvale Land LLC for approval of amended Master Concept Plan pursuant to Section 28.4.3 of the City of Woburn Zoning Ordinance, as amended, for...
Motion made and 2nd that the PUBLIC HEARING BE CLOSED, all in favor, 9-0.
“Motion made and 2nd that the PUBLIC HEARING BE CLOSED, all in favor, 9-0..”
Grant the special permit and site plan review and that the City Council makes the following findings pursuant to 1985 Woburn Zoning Ordinances, as amended, Section 28.14.4: 1. The ways providing...
Motion made and 2nd to grant the special permit and site plan review and that the City Council makes the following findings pursuant to 1985 Woburn Zoning Ordinances, as amended, Section 28.14.4: 1. The ways providing vehicular and pedestrian access have the capacity to provide safe ingress and egress to property and proposed structures thereon and uses thereof with particular reference to automotive and pedestrian safety and convenience, traffic flow and control and emergency access in case of fire, emergency or catastrophe; 2. Adequate water, sewerage and drainage facilities exist or will exist to service the proposed use; 3. Adequate off-street parking and loading areas have been provided where required and will not result in undue noise, glare, or odor effects on adjoining properties or on properties generally in the district; 4. Satisfactory provision has been made for snow storage/removal to ensure safety and for refuse collection, disposal and service areas to minimize negative impacts on adjacent uses; 5. Exterior lighting has been designed to minimize glare and any negative impacts on abutting roadways and properties and to be compatible and in harmony with other properties in the immediate area; 6. Appropriate yards and other open space and landscaping have been provided as required and reasonable steps have been taken to insure the privacy of adjacent existing uses; 7. The proposed use is generally compatible in scale and character with adjacent properties and othe
“Motion made and 2nd to grant the special permit and site plan review and that the City Council makes the following findings pursuant to 1985 Woburn Zoning Ordinances, as amended, Section 28.14.4: 1. The ways providing vehicular and pedestrian access have the capacity to provide safe ingress and egress to property and proposed structures thereon and uses thereof with particular reference to automotive and pedestrian safety and convenience, traffic flow and control and emergency access in case of fire, emergency or catastrophe; 2. Adequate water, sewerage and drainage facilities exist or will exist to service the proposed use; 3. Adequate off-street parking and loading areas have been provided where required and will not result in undue noise, glare, or odor effects on adjoining properties or on properties generally in the district; 4. Satisfactory provision has been made for snow storage/removal to ensure safety and for refuse collection, disposal and service areas to minimize negative impacts on adjacent uses; 5. Exterior lighting has been designed to minimize glare and any negative impacts on abutting roadways and properties and to be compatible and in harmony with other properties in the immediate area; 6. Appropriate yards and other open space and landscaping have been provided as required and reasonable steps have been taken to insure the privacy of adjacent existing uses; 7. The proposed use is generally compatible in scale and character with adjacent properties and other properties in the district; 8. The proposed use(s) or structure(s) will not detract from the general purposes of this ordinance and either comply in all respects with the provisions of the Woburn Zoning Ordinance or has obtained relief (i.e. waiver, special permit or variance) as may be required; and 9. The proposal incorporates additional conditions and requirements as the City Council finds reasonably appropriate to safeguard the neighborhood or otherwise serve the purposes of this Ordinance, including but not 28-13 limited to the following: Front, side or rear yards greater than the minimum required by this ordinance; requirements for screening, buffers, planting strips, fences or walls; modification of proposed exterior facades of the structure; limitation upon the size, number of occupants, method and time of operation, or extent of facilities; regulation of the number, size and location of drives, access ways, or other traffic features, and off-street parking or loading, or other special features beyond the minimum required in the ordinance, further that the following conditions shall apply to the approvals: 1. The Applicant shall construct and improve the site as substantially described in the plans submitted with the Special Permit Application entitled: "The Vale Master Plan Development 1 Hill Street, Woburn, MA Site Plan Approval & Special Permit" dated September 1, 2021, revised November 29, 2021 consisting of Sheet No. V-101; Sheet No. V-102; Sheet No. V-103; Sheet No. V-104; Sheet 1; Sheet 2; Sheet 3; Sheet 4; Sheet G- 001; Sheet G-002; Sheet L-201; Sheet L-202; Sheet L-203; Sheet L-204; Sheet L-301; Sheet L-302; Sheet L-303; Sheet L-304; Sheet C-401; Sheet C-402; Sheet C-403; Sheet C-404; Sheet C-405; Sheet C-406; Sheet C-407; Sheet C-408; Sheet C-409; Sheet C-410; Sheets C-411; Sheet L-501; Sheet L -502; Sheet L-503; Sheet L-504; Sheet L-601; Sheet L-602; Sheet L- 603; Sheet C-604; Sheet C-605; Sheet C-606; Sheet C-607; Sheet L-901; Sheet L-902; Sheet L-903; Sheet L-904; Sheet L-1001; Sheet L-1002; Sheet L-1003; Sheet L-1004; Sheet L-1101; Sheet A0.00.00; Sheet A1.P1.01; Sheet A1.10.01; Sheet A1.20.00; Sheet A1.60.01; Plan A1.70.01; Plan A4.01.01; Plan A4.01.02; Sheet A4.04.03; Sheet B1.10.00; Sheet B1.20.00; Sheet B1.30.00; Sheet B1.40.00; Sheet B4.01.01; Sheet B4.01.02; Sheet C1.01.01; Sheet C4.01.01 prepared by Stantec, 226 Causeway Street, 6th floor, Boston, MA. (hereinafter the "Site Plan") although design adjustments and modifications generally associated with: (i) preparing so-called "working drawings" or (ii) site conditions shall be permitted so long as such changes do not constitute substantial changes from said plans as determined by the Building Commissioner. In the event that the Building Commissioner determines that the building plans filed with the Building Permit Application are not in substantial conformance with the Site Plan, the Applicant may request a review of said plans by the City Council Special Permits Committee who shall make a final determination. If the Special Permits Committee makes a determination that the proposed plans are not in conformance with the Site Plan, the Applicant shall be required to file a Special Permit Petition seeking approval to modify the Site Plan; 2. Except in the event of an emergency, work on the exterior of the site shall be from 7:00 a.m. - 6:00 p.m. Monday through Friday, and 8:00 a.m. - 5:00 p.m. on Saturdays. No work on the exterior of the site shall be permitted on Sunday, or state and federal holidays recognized by the City of Woburn; 3. There shall be adequate rodent control in place prior to commencement of any site disturbance and maintained throughout all site development and construction phases. The Applicant shall provide monthly rodent control reports to both the Board of Health and the Department of Inspectional Services; 4. Prior to the issuance of a Building Permit, the Applicant shall file a snow storage and removal plan with the Department of Inspectional Services; 5. All dumpsters, if any, shall be enclosed, by means of a fence, wall or landscaping in compliance with the Woburn Zoning Ordinance and Title 8 Section VII 8- 17 of the Woburn Municipal Code. In addition rodent control measures in connection with any dumpsters shall be in place and maintained; 6. As-built plans shall be provided at the conclusion of the project to the satisfaction of the Engineering Department and Department of Inspectional Services. In addition, the Applicant shall provide interim as-built plans as required during permitting coordination with the City Engineer and Building Commissioner; 7. Landscaping shall be installed substantially in conformance with the Landscaping Plan as submitted by the Applicant to the City Council, except as otherwise provided for in these Conditions. Such landscaping shall be maintained, repaired or replaced by the Applicant and/or its successors and assigns, as needed to maintain compliance with such Landscape Plan and other applicable requirements; 8. In addition to those permanent signs approved in connection with the Project, the Applicant may display, on the Project property, temporary construction, marketing, or similar signs stating appropriate and applicable information advertising the Project. All signage plans shall be as shown on the plans submitted to the City Council and subject to Section 28.10 of the Woburn Zoning Ordinance; 9. The Project is contingent upon the issuance of an Amended Order of Conditions by the Woburn Conservation Commission (and/or Superseding Order of Conditions issued by MassDEP) pursuant to the Massachusetts Wetlands Protection Act, and implementing regulations (310 CMR 10.00 et seq.), and shall comply with the Massachusetts Department of Environmental Protection Stormwater Policy. Any material changes required in the Project as a result of the issuance of an Order of Conditions, shall be reviewed by the City Council pursuant to Condition One; 10. The Applicant shall submit monthly construction reports to the City Council, Building Commissioner, City Engineer, Fire Department and Conservation Commission; 11. A Dust Management/Mitigation plan for dust control during all phases of sitework/ construction shall be filed with the Department of Inspectional Services; 12. Any "accessory high hazard use" on the premises shall be subject to all requirements of the Massachusetts Building Code and Massachusetts Fire Code; 13. Prior to the construction of the parking garage shown on the Plan, the Applicant shall relocate the sewer line from under the proposed building; 14. The Applicant shall install way finding signage and pavement markings substantially similar to the way finding signage and pavement markings presented to the City Council; 15. All the exterior building illumination shall be dark sky compliant and shielded to minimize excess light glare towards abutting properties; 16. The exterior design of the buildings shall be substantially as shown on the architectural plans filed with the Site Plan Review/Special Permit Application filed with the City Clerk's Office; 17. Buildings to be designed and constructed in accordance with target Greenhouse Gas emission reductions as set forth in the Project's FEIR and MEPA Certificate #15923. Upon construction of the buildings, the Applicant shall have the buildings modeled and tested to ensure compliance with target Greenhouse Gas emission reductions; 18. Prior to the request for the last Occupancy Permit for the first commercial building to be constructed pursuant to this Site Plan Review/Special Permit approval, all Phase 1 Improvements described in the Development Agreement by and between the City of Woburn and Montvale Land LLC dated November 21, 2019 (the "Development Agreement") must be substantially completed by Montvale Land LLC as follows: Montvale Avenue Improvements: 1. Upgrading Montvale Avenue at Hill Street/I-93 SF Off-Ramp, the Montvale Avenue at I-93 NB Ramps, and the Montvale Avenue at Maple Street/Unicorn Park Drive to provide for an adaptive traffic signal system; 2. Widening Hill Street, i. At Montvale Avenue to provide two exit lanes and one entrance lane; and ii. To construct a traffic rotary to improve the traffic flow entering the Site from Hill Street; 3. Installing Pedestrian accommodations along Hill Street that integrate with the current Montvale Avenue pedestrian network. 4. Decommission all existing wells on the Property and abandon the water lines running from the wells to the existing building, under the auspices/guidance of the Department of Environmental Protection; and 19. Prior to the request for the last Occupancy Permit for the first commercial building to be constructed pursuant to this Site Plan Review/Special Permit approval, all Phase 1 Improvements described in the Development Agreement by and between the City of Woburn and Montvale Land LLC dated November 21, 2019 (the "Development Agreement") must be substantially completed by Montvale Land LLC as follows: The Applicant shall install the following traffic signal upgrades: Montvale Ave at Wood Street: Provide a new M 60 Controller with the latest firmware; Provide a new GS2 Controller with performance plus package; Provide a new Applied Information unit with a 5 year plan; Retain all other equipment; Montvale Ave at Main Street: Provide a new GS2 Controller with performance plus package; Retain all other equipment; and that the City Council finds the benefits of the proposal as follows: Community Benefits: Fulfills the City of Woburn's TBOD municipal planning goals and completes much needed environmental remediation work, including the removal of more than 400,000sf of existing dilapidated structures and the remediation of existing environmental conditions associated with the Kraft Plant (as outlined further below); Redevelopment of the Project Site affords the opportunity to enhance the natural resource of Sweetwater Brook, improve stormwater management, recover riverbank that is presently enclosed within culverted sections of Sweetwater Brook, and convert degraded impervious land into new green space; Preserves approximately 28 acres of undeveloped open space and natural resource areas, amounting to approximately 35 percent of the Project's contiguous area; Overall, the Project will result in a net gain of wetlands on the property; Provides for the construction of a robust stormwater management system. Notably, no stormwater mitigation measures currently exist within the Project Site; Provides an important buffer to the Aberjona Riverfront Area by leaving the area at the west and south of the Project Site as undeveloped land; Provides improved, landscaped open space distributed throughout the Project Site; Includes a new connection between the site and the existing Tri-Community Greenway; The Project has offered to donate Walker Pond to the City of Woburn (if desired) for open space or other purposes; The Project has offered to donate approximately 18 acres of valuable land along Sunset Road and the Aberjona River to the Town of Winchester (if desired); Economic: Completes the extensive and costly environmental remediation work, including the removal of all existing structures and the remediation of existing environmental conditions associated with the Kraft Plant; Transforms an underutilized site into a new, dynamic mixed-use destination anchored by open space that responds to proposed and surrounding uses and fulfills PDA planning goals; Creates a significant number of new construction-period jobs as well as a variety of permanent job opportunities while spurring economic development through the phased construction of a mix of retail/office/lab/flex/R&D uses; Creates new retail areas anticipated to activate the public realm and encourage increased public use and enjoyment; Anticipates generating approximately $6.5 million annually in new real estate taxes for the City of Woburn upon stabilization of the full-build Project. (This estimate assumes stabilization of the full-build Project in 2024.); Restoration of Sweetwater Brook: Project goes well beyond the requirements of the Wetlands Protection Act regulations - not only avoiding and minimizing impacts to wetland resource areas and providing an improvement to the Riverfront Area, but also providing a full stream restoration to naturalize this highly altered stream. The proposed Project restores approximately 800-feet of Sweetwater Brook to a significantly improved naturalized state; As planned, the restoration will create approximately two (2) acres of new open space in the vicinity of the Brook; Restoration will create ecological value in the landscape; bringing back natural features that were removed by past industrial use and adding features such as meander sinuosity and riffle and pool complexes; Sweetwater Brook restoration work will result in the removal of 1.5 acres of impervious surfaces within the Riverfront Area and increased public access to the Riverfront Area; In the final condition, approximately 23,539 square feet of floodplain immediately adjacent to Sweetwater Brook will be revegetated, thereby further removing impervious surfaces; Proposed bridges fully meet Massachusetts Stream Crossing Standards which provide a significantly improved wildlife and fish crossing over existing crossings; Environmental Clean Up: Completes the extensive and costly environmental remediation work under Massachusetts clean up regulations known as the Massachusetts Contingency Plan (MCP), including the removal of all existing structures and the remediation of existing environmental conditions associated with the Kraft Plant; The remediation work will excavate and remove the underlying gelatin fill source material within the wetland and upland areas where ammonia in groundwater exceeds applicable MCP standards; The Project will achieve an MCP Permanent Solution through the excavation and replacement of fill and gelatin fill soils from the townhouse area to meet MCP S-1 Unrestricted Residential Use Standards; The Project will achieve an MCP Permanent Solution through the removal of degraded gelatin fill materials within the wooded slope/former lagoon area to remove the source of ammonia in groundwater; The Project will achieve an MCP Permanent Solution through the removal of adjoining apron of surficial organic soils with elevated arsenic concentrations within the former lagoon/wetlands; The Project will achieve an MCP Permanent Solution through the removal of existing petroleum saturated soils at the power plant area to remediate the existing petroleum conditions; Transportation: The Proponent will rebuild and reconstruct Hill Street as the build-out of the Project is completed. The new and widened Hill St will not only serve as an improved entry to the site, it will aid in the flow of traffic at the McDonald's and will also include upgrades to traffic signals at three key intersections on Montvale Avenue; Future phases of work will incorporate more significant upgrades to Montvale Avenue and the adjacent I-93 on and off ramps as density on site increases; The Project will rebuild and reconstruct the existing State-owned parking lot on the western side of Hill Street into a new Park and Ride, with new striping, improved lighting, appropriate signage for commuter use, and new stormwater management improvements; The Project will design and construct a new connection between the site and the existing Tri-Community Greenway; If approved by the MBTA, relocate the 'Montvale / Route 93' stop of the MBTA 354 Woburn - Downtown bus to a new location accessible from the Project Site for an upgraded and safer location for riders to get on and off the bus; As the commercial buildings are constructed, introduce a robust Transportation Demand Management ("TDM") plan that aims to discourage single occupancy vehicle travel and encourage and incentivize use of alternative modes for all users: Climate Resiliency: Redevelopment of the Project Site affords the opportunity to enhance the natural resource of Sweetwater Brook, improve stormwater management, recover riverbank that is presently enclosed within culverted sections of Sweetwater Brook, and convert degraded impervious land into new green space; The Project will also remediate and restore approximately 14,615 SF of wetlands in the southwest portion of the Project Site where gelatin constituents were historically landfilled; The Project proposes to raise the elevation of the Project Site to reduce the risk of flooding to buildings on-site. Proposed Finished Floor Elevations ("FFE"), with the exception of the northern garage, will be located above the forecasted 2070 flood elevation of the Aberjona River and Sweetwater Brook. Although the northern garage FFE is below the forecasted flood elevations, it is designed to be floodable, and will be designed to provide flood storage during forecasted peak flood events; The Project will restore the existing wetland and create approximately 5,565 SF of wetland area around the perimeter of the existing wetland where source material is removed from uplands. This will result in one improved, continuous wetland area and a net gain of wetland area on the property. The Project proposes a four-year monitoring effort to remove invasive plant species from the wetland areas to allow newly planted native species to thrive; The wetland replication effort will increase the amount of wetland area on the Project Site as well as the diversity of wetland species present in this area. The Project proposes a four-year monitoring effort to remove invasive plant species from the wetland areas to allow newly planted native species to thrive; The Project Site grading and drainage plan raises key portions of the Project Site for flood protection, while optimizing flood storage capacity in the northern portion of the Project Site, which is located within the 100-year floodplain; The Project will minimize the off-site transport of soils and other excavated materials to reduce carbon footprint, save valuable landfill space, and limit environmental impacts through Massachusetts "Greener Cleaner" Best Management Practices; The Proponent will work closely with the City and explore opportunities during the local planning and review process to advance the design of the Project to be consistent with any identified goals or outcomes that arise from the Municipal Vulnerability Preparedness ("MVP") Program planning process; The Project analyzed forecasted rainfall climate conditions using the Project's hydrologic and hydraulic modeling. A comparison was completed of a no-build vs. build condition which modeling results indicate that there were no increases in flood levels from a future 100-year rainfall event as a result of the Project; Reduced Greenhouse Gas Emissions: The Project aims to achieve a reduction in stationary source CO2 emissions below an ASHRAE 90.1-2013 baseline, currently estimated at 15.7 percent, by reducing overall energy consumption by approximately 20.1 percent over the ASHRAE 90.1-2013 baseline; The Proponent is committed to requiring developers and end users to construct solar-ready roof space for a potential photovoltaic ("PV") installation on building rooftops, as feasible. Given the changing incentive marketplace for solar PV and the length of time for the Master Plan Project to be completed, solar PV systems will continue to be assessed for their feasibility as future building uses and tenants are identified; On the commercial portion of the site, the Project will install preferred parking spaces for hybrid and electric vehicles as well as dual electric vehicle curb-side universal charging stations; Additionally, as the development of the Project proceeds, the Proponent will endeavor to provide up to approximately five percent (5%) of total commercial parking spaces with universal charging stations, and up to an additional approximately five percent (5%) of total commercial parking spaces as EV-Ready spaces; Water Quality/Stormwater Management and Conservation: Currently, no stormwater mitigation measures exist within the Project Site. The Project will improve these existing conditions by constructing a robust stormwater management system that includes measures to provide groundwater recharge, attenuate peak flows and provide water quality treatment that will meet or exceed the Mass DEP and City of Woburn Stormwater Management Standards; The Project has completed this "no-rise" analysis which shows that the project will not result in an increase in flood levels during the base flood (100-year) event; The Project will provide a "no-rise" certificate certified by a registered professional engineer to the communities of Stoneham, Woburn, and Winchester prior to construction; The Project will implement a treatment train of best management practices ("BMPs") to improve water quality, reduce runoff volumes, and reduce peak discharge rates of runoff in comparison to pre-development conditions; The Project includes new, larger stormwater infrastructure (culverts and/or bridges), to handle future increased stormwater flows in Sweetwater Brook, all in favor, 9-0..”
Any and all communication be received and made part of the permanent record — On the petition by Cabot, Cabot & Forbes LLC, 185 Dartmouth Street, Suite 402, Boston, Massachusetts 02116, for...
Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that any and all communication be received and made part of the permanent record, all in favor, 9-0..”
The documents be received and made part of the permanent record — On the petition by Cabot, Cabot & Forbes LLC, 185 Dartmouth Street, Suite 402, Boston, Massachusetts 02116, for Special Permit...
Motion made and 2nd that the documents be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that the documents be received and made part of the permanent record, all in favor, 9-0..”
Amend Condition No. 12 to read "There shall be no three (3) bedroom units,"
Motion made and 2nd to amend Condition No. 12 to read "There shall be no three (3) bedroom units," all in favor, 9-0.
“Motion made and 2nd to amend Condition No. 12 to read "There shall be no three (3) bedroom units," all in favor, 9-0..”
Add Condition No. 17 as follows "Petitioner shall submit a new floorplan and affordable housing layout,"
Motion made and 2nd to add Condition No. 17 as follows "Petitioner shall submit a new floorplan and affordable housing layout," all in favor, 9-0.
“Motion made and 2nd to add Condition No. 17 as follows "Petitioner shall submit a new floorplan and affordable housing layout," all in favor, 9-0..”
The public hearing be opened for public comments — On the petition by Cabot, Cabot & Forbes LLC, 185 Dartmouth Street, Suite 402, Boston, Massachusetts 02116, for Special Permit pursuant to...
Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0.
“Motion made and 2nd that the public hearing be opened for public comments, all in favor, 9-0..”
The public hearing be closed — On the petition by Cabot, Cabot & Forbes LLC, 185 Dartmouth Street, Suite 402, Boston, Massachusetts 02116, for Special Permit pursuant to Section 23.5.5.2(a),...
Motion made and 2nd that the PUBLIC HEARING BE CLOSED, all in favor, 9-0.
“Motion made and 2nd that the PUBLIC HEARING BE CLOSED, all in favor, 9-0..”
Grant the special permit with the following 17 Conditions, as amended: 1. The Applicant shall construct and improve the site as substantially described in the plans submitted with the Special...
Motion made and 2nd to grant the special permit with the following 17 Conditions, as amended: 1. The Applicant shall construct and improve the site as substantially described in the plans submitted with the Special Permit Petition entitled: "Site Development Plans for Mixed Use Development, 0 New Boston Street Rear, Woburn, MA" dated May 7, 2020, revised September 2, 2021; revised November 26, 2021; Sheet EX-1 dated December 1, 2021; Sheet ANR-1 dated July 28, 2021; Sheet C-001 dated September 2, 2021, revised November 26, 2021; Sheet C-002 dated September 2, 2021, revised November 26, 2021; Sheet C-101 dated September 2, 2021, revised November 26, 2021; Sheet C-102 dated September 2, 2021, revised November 26, 2021; Sheet C-103 dated September 2, 2021, revised November 26, 2021; Sheet C-104 dated September 2, 2021, revised November 26, 2021; Sheet C-105 dated September 2, 2021, revised November 26, 2021; Sheet C-106 dated September 2, 2021, revised November 26, 2021; Sheet C-107 dated September 2, 2021, revised November 26, 2021; Sheet C-501 dated September 2, 2021, revised November 26, 2021; Sheet C-502 dated September 2, 2021, revised November 26, 2021; Sheet C-503 dated September 2, 2021, revised November 26, 2021; Sheet C-504 dated September 2, 2021, revised November 26, 2021; Sheet C-505 dated September 2, 2021, revised November 26, 2021; Sheet C-506 dated September 2, 2021, revised November 26, 2021; Sheet C-507 dated September 2, 2021, revised November 26, 2021; Sheet
Yes: Demers, Ferullo, Gately, Lannan, TedescoNo: Campbell, Concannon, Dillon, Mercer-Bruen
“Motion made and 2nd to grant the special permit with the following 17 Conditions, as amended: 1. The Applicant shall construct and improve the site as substantially described in the plans submitted with the Special Permit Petition entitled: "Site Development Plans for Mixed Use Development, 0 New Boston Street Rear, Woburn, MA" dated May 7, 2020, revised September 2, 2021; revised November 26, 2021; Sheet EX-1 dated December 1, 2021; Sheet ANR-1 dated July 28, 2021; Sheet C-001 dated September 2, 2021, revised November 26, 2021; Sheet C-002 dated September 2, 2021, revised November 26, 2021; Sheet C-101 dated September 2, 2021, revised November 26, 2021; Sheet C-102 dated September 2, 2021, revised November 26, 2021; Sheet C-103 dated September 2, 2021, revised November 26, 2021; Sheet C-104 dated September 2, 2021, revised November 26, 2021; Sheet C-105 dated September 2, 2021, revised November 26, 2021; Sheet C-106 dated September 2, 2021, revised November 26, 2021; Sheet C-107 dated September 2, 2021, revised November 26, 2021; Sheet C-501 dated September 2, 2021, revised November 26, 2021; Sheet C-502 dated September 2, 2021, revised November 26, 2021; Sheet C-503 dated September 2, 2021, revised November 26, 2021; Sheet C-504 dated September 2, 2021, revised November 26, 2021; Sheet C-505 dated September 2, 2021, revised November 26, 2021; Sheet C-506 dated September 2, 2021, revised November 26, 2021; Sheet C-507 dated September 2, 2021, revised November 26, 2021; Sheet C-508 dated September 2, 2021, revised November 26, 2021; Sheet L-101 dated September 2, 2021, revised November 26, 2021; Sheet L-102 dated September 2, 2021, revised November 26, 2021 and Sheet BMP dated November 26, 2021 prepared by Allen & Major Associates, Inc., 100 Commerce Way, Woburn, MA 01801 (hereinafter the "Site Plan") although design adjustments and modifications generally associated with: (i) preparing so-called "working drawings" or (ii) site conditions shall be permitted so long as such changes do not constitute substantial changes from said plans as determined by the Building Commissioner. In the event that the Building Commissioner determines that the building plans filed with the Building Permit Application are not in substantial conformance with the Site Plan, the Applicant may request a review of said plans by the City Council Special Permits Committee who shall make a final determination. If the Special Permits Committee makes a determination that the proposed plans are not in conformance with the Site Plan, the Applicant shall be required to file a Special Permit Petition seeking approval to modify the Site Plan; 2. Except in the event of an emergency, work on the exterior of the site shall be from 7:00 a.m. - 6:00 p.m. Monday through Friday, and 8:00 a.m. - 5:00 p.m. on Saturdays. No work on the exterior of the site shall be permitted on Sunday, or state and federal holidays recognized by the City of Woburn; 3. There shall be adequate rodent control in place prior to commencement of any site disturbance and maintained throughout all site development and construction phases. The Applicant shall provide monthly rodent control reports to both the Board of Health and the Department of Inspectional Services; 4. Prior to the issuance of a Building Permit, the Applicant shall file a snow storage and removal plan with the Department of Inspectional Services; 5. All dumpsters, if any, shall be enclosed, by means of a fence, wall or landscaping in compliance with the Woburn Zoning Ordinance and Title 8 Section VII 8-17 of the Woburn Municipal Code. In addition rodent control measures in connection with any dumpsters shall be in place and maintained; 6. As- built plans shall be provided at the conclusion of the Project to the satisfaction of the Engineering Department and Department of Inspectional Services. In addition, the Applicant shall provide interim as-built plans as required during permitting coordination with the City Engineer and Building Commissioner; 7. Landscaping shall be installed substantially in conformance with the Landscaping Plan as submitted by the Applicant to the City Council, except as otherwise provided for in these Conditions. Such landscaping shall be maintained, repaired or replaced by the Applicant and/or its successors and assigns, as needed to maintain compliance with such Landscape Plan and other applicable requirements; 8. In addition to those permanent signs approved in connection with the Project, the Applicant may display, on the Project property, temporary construction, marketing, or leasing similar signs stating appropriate and applicable information advertising the Project. All signage shall be as shown on the plans submitted to the City Council and subject to Section 23.9 of the Woburn Zoning Ordinance; 9. The Applicant shall submit monthly construction reports to the City Council, Building Commissioner, City Engineer, Fire Department and Conservation Commission; 10. A Dust Management/Mitigation plan for dust control during all phases of sitework/ construction shall be filed with the Department of Inspectional Services; 11. The Project shall not exceed 250 units; 12. There shall be no three (3) bedroom units; 13. The Applicant must comply with the Requirements of Section 11.11 of the Zoning Ordinance (Affordable Housing Requirement) relative to the creation of 15% affordable housing units (i.e. 15% of 250 is 38 units); 14. During the period of construction and for ongoing marketing purposes, notwithstanding any pre-conditions for the issuance of a Building Permit or Certificate of Occupancy otherwise set forth herein, the Applicant shall be entitled to designate and utilize for marketing purposes (on a temporary or permanent basis) several of the units as decorated model units for leasing purposes. The model units and leasing office(s) shall be subject to the usual requirements of the Building Commissioner with respect to building and fire code compliance; 15. All buildings in the Project will incorporate the following green building techniques helping to achieve the targeted greenhouse gas reductions: a. Water efficient landscaping will be installed to minimize water use; b. The Project will employ best practices for stormwater design and construct a new stormwater management system that meets current DEP requirements; c. Residents will have access to bicycle racks in close proximity to the buildings and interior bike storage; d. The Project will include parking spaces for hybrid and electrical vehicles as well as dual electric vehicle curb-side universal charging stations integrated into the garage structure; e. Roof and wall installation and window glass will be designed to meet or exceed code; f. Light colored material will be used on the flat building roofs (cool roofs); g. Commitment to have "solar-ready" space available for a possible third- party photo-voltaic (PV) installation on a portion of the roofs, as possible; h. The heating/cooling system as a condensing (or instantaneous), gas-fired heat and hot water system with a 95% efficiency (AFUE 95%), and a high-efficiency air conditioning unit SEER 14. Heating and cooling efficiency will meet or exceed Code; i. The residential units will have programmable thermostats to allow residents to set back temperatures during non-occupancy times; j. High-efficiency LED fixtures will be used to reduce interior light power efficiency; k. Energy efficient LED fixtures will be used to light the parking lots and exterior walkways; l. Motion detectors in common areas to reduce energy consumption; m. Incorporation of Energy STAR appliances; n. All buildings will have low-flow toilets and shower heads; o. Faucet aerators for decreasing water consumption using mixed air; p. Onsite recycling programs, including recycling receptacles located in common areas; q. Trash compactor to be located in the building; 16. Mitigation for this Project shall be the payment of a monetary contribution of $150,000.00 toward the installation of traffic control and associated geometric improvements at New Boston Street at Merrimack Street, and New Boston Street at Woburn Street and Presidential Way; and 17. Petitioner shall submit a new floorplan and affordable housing layout, ROLL CALL: Campbell - No; Concannon - No; Demers - Yes, Dillon - No; Ferullo - Yes; Gately - Yes; Lannan - Yes; Mercer-Bruen - No; Tedesco - Yes. MOTION PASSES..”
Suspend the rules to take from the table the next four matters under Unfinished Business of Preceding Meeting
Motion made and 2nd to suspend the rules to take from the table the next four matters under Unfinished Business of Preceding Meeting, all in favor, 9-0.
“Motion made and 2nd to suspend the rules to take from the table the next four matters under Unfinished Business of Preceding Meeting, all in favor, 9-0..”
The matter be referred to the Committee on Ordinance, Charter and Rules — Order: Title 2, Administration and Personnel, of the Woburn Municipal Code, as amended, be further amended as described...
Motion made and 2nd that the matter be referred to the Committee on Ordinance, Charter and Rules, all in favor, 9-0.
“Motion made and 2nd that the matter be referred to the Committee on Ordinance, Charter and Rules, all in favor, 9-0..”
The matter be referred to the Committee on Ordinance, Charter and Rules — Order: Title 3, Revenue and Finance, of the Woburn Municipal Code, as amended, be further amended as follows: (deleted...
Motion made and 2nd that the matter be referred to the Committee on Ordinance, Charter and Rules, all in favor, 9-0.
“Motion made and 2nd that the matter be referred to the Committee on Ordinance, Charter and Rules, all in favor, 9-0..”
The matter be referred to the Committee on Ordinance, Charter and Rules — Order: Title 13, Public Services, of the Woburn Municipal Code, as amended, be further amended as follows: (deleted...
Motion made and 2nd that the matter be referred to the Committee on Ordinance, Charter and Rules, all in favor, 9-0.
“Motion made and 2nd that the matter be referred to the Committee on Ordinance, Charter and Rules, all in favor, 9-0..”
The matter be referred to the Committee on Ordinance, Charter and Rules — Order: Pursuant to m.g.l. c.40A, §9 and Section 11.3.1 of the Woburn Zoning Ordinance as amended, that the following...
Motion made and 2nd that the matter be referred to the Committee on Ordinance, Charter and Rules, all in favor, 9-0.
“Motion made and 2nd that the matter be referred to the Committee on Ordinance, Charter and Rules, all in favor, 9-0..”
Return to the regular order of business
Motion made and 2nd to return to the regular order of business, all in favor, 9-0.
“Motion made and 2nd to return to the regular order of business, all in favor, 9-0..”
The committee report be adopted — A committee report was received "ought to pass" for the following: Petitions for renewal of First Class Motor Vehicles Sales Licenses by the following: Lawless...
Motion made and 2nd that the COMMITTEE REPORT BE ADOPTED, all in favor, 9-0.
“Motion made and 2nd that the COMMITTEE REPORT BE ADOPTED, all in favor, 9-0..”
The committee report be adopted — A committee report was received "ought to pass" for the following: Petitions for renewal of Second Class Motor Vehicles Sales Licenses by the following: Lawless...
Motion made and 2nd that the COMMITTEE REPORT BE ADOPTED, all in favor, 9-0.
“Motion made and 2nd that the COMMITTEE REPORT BE ADOPTED, all in favor, 9-0..”
The committee report be adopted — A committee report was received "ought to pass" for the following: Petition for renewal of Third Class Motor Vehicles Sales License by Woburn Truck and Auto, Inc....
Motion made and 2nd that the COMMITTEE REPORT BE ADOPTED, all in favor, 9-0.
“Motion made and 2nd that the COMMITTEE REPORT BE ADOPTED, all in favor, 9-0..”
The matter be referred to Committee on Liaison — Petition by June Mackenzie regarding notification and enforcement of the plastic bag ban
Motion made and 2nd that the MATTER BE REFERRED TO COMMITTEE ON LIAISON, all in favor, 9-0.
“Motion made and 2nd that the MATTER BE REFERRED TO COMMITTEE ON LIAISON, all in favor, 9-0..”
The matter be received and placed on file — A communication dated November 17, 2021 was received from Charles O'Connor, Parking Clerk, Police Headquarters, 25 Harrison Avenue as follows: Council...
Motion made and 2nd that the MATTER BE RECEIVED AND PLACED ON FILE, all in favor, 9-0.
“Motion made and 2nd that the MATTER BE RECEIVED AND PLACED ON FILE, all in favor, 9-0..”
The communication be received and made part of the permanent record — A communication dated December 2, 2021 was received from Ellen Callahan Doucette, City Solicitor, as follows: Re: Order to...
Motion made and 2nd that the communication be received and made part of the permanent record, all in favor, 9-0.
“Motion made and 2nd that the communication be received and made part of the permanent record, all in favor, 9-0..”
The matter be laid on the table — A communication dated December 2, 2021 was received from Ellen Callahan Doucette, City Solicitor, as follows: Re: Order to Authorize Sale of 0 Lamoil Street - Map...
Motion made and 2nd that the MATTER BE LAID ON THE TABLE, all in favor, 9-0.
“Motion made and 2nd that the MATTER BE LAID ON THE TABLE, all in favor, 9-0..”
The order be adopted — Order: The City Council approve the following materials related to Reprecincting following the 2020 United States Decennial Census: final map; final Block Listing Report by...
Motion made and 2nd that the ORDER BE ADOPTED, all in favor, 9-0.
“Motion made and 2nd that the ORDER BE ADOPTED, all in favor, 9-0..”
Adjourn
Motion made and 2nd to ADJOURN, all in favor, 9-0.
“Motion made and 2nd to ADJOURN, all in favor, 9-0..”
From the Woburn City Council’s official journals (its minutes), posted on the city’s Minutes & Agendas page (City Council). We check every vote against the councilors present and quote the exact wording. MassVoter never grades or scores officials. Photos (the city’s website has no councilor photos): Robert Toro, Joseph Demers (courtesy of each), Jeffrey Dillon, Lou DiMambro and Charles Viola from Woburn Patch (2019–2023); Yano Amara (December 31, 2025) and Darlene Mercer-Bruen (July 23, 2021, captioned group photo, cropped) from the Daily Times Chronicle; William Pappalardo and Robert Ferullo cropped from the Daily Times Chronicle’s captioned 2026 City Council photo (January 7, 2026). Former councilors show initials.
How to read these pagesWhere the votes come from, how we check them against the official minutes, what isn't included yet, and how to report a mistake.About city pages →