← Lexington Select Board

Lexington Select Board · 2025–2026 Board · Regular meeting

August 4, 2025

4 recorded votes, 0 with disagreement.

Sources: Official minutes (PDF)

A monthly email on what it voted on, starting in November.

Election Day · Tuesday, Nov 3

Your Lexington ballot: 13 quizzes, about a minute each.

Start my ballot →

Attendance

Present: Jill Hai, Joseph Pato, Douglas Lucente, Mark Sandeen, Vineeta Kumar

Absent: None

Every vote, in order

National Diaper Need Awareness Week - September 15 - 21, 2025

Approve the Consent Agenda, with the exception of the July 16, 2025 Joint Meeting; and July 17, 2025 Select Board Goals Retreat meeting minutes

Minutes, page 3

Approve minutesPassed · Unanimous, 5 present

VOTE: Upon motion duly made and by roll call, the Select Board voted 5-0 to approve the Consent Agenda, with the exception of the July 16, 2025 Joint Meeting; and July 17, 2025 Select Board Goals Retreat meeting minutes.

From the minutes

“VOTE: Upon motion duly made and by roll call, the Select Board voted 5-0 to approve the Consent Agenda, with the exception of the July 16, 2025 Joint Meeting; and July 17, 2025 Select Board Goals Retreat meeting minutes..”

Read it in the official minutes, page 3 (PDF)

(MWRA)

Approve a Noise Bylaw Special Permit for the MWRA to perform evening/overnight work between 7:00PM to 5:00AM, Mondays, Tuesdays, Wednesdays & Thursdays between September 2 - 30, 2025, for the...

Minutes, page 4

ApprovePassed · Unanimous, 5 present

VOTE: Upon motion duly made and by roll call, the Select Board voted 5-0 to approve a Noise Bylaw Special Permit for the MWRA to perform evening/overnight work between 7:00PM to 5:00AM, Mondays, Tuesdays, Wednesdays & Thursdays between September 2 - 30, 2025, for the installation of 300 linear feet of pipeline on Massachusetts Avenue from Hibbert Street to 1540 Massachusetts Avenue related to the water pipeline improvements for the Northern Extra High (NEH) pressure zone, maintaining emergency vehicular access at all time and utilizing all available means of noise mitigation towards residential impact.

From the minutes

“VOTE: Upon motion duly made and by roll call, the Select Board voted 5-0 to approve a Noise Bylaw Special Permit for the MWRA to perform evening/overnight work between 7:00PM to 5:00AM, Mondays, Tuesdays, Wednesdays & Thursdays between September 2 - 30, 2025, for the installation of 300 linear feet of pipeline on Massachusetts Avenue from Hibbert Street to 1540 Massachusetts Avenue related to the water pipeline improvements for the Northern Extra High (NEH) pressure zone, maintaining emergency vehicular access at all time and utilizing all available means of noise mitigation towards residential impact..”

Read it in the official minutes, page 4 (PDF)

Public Hearing: Grant of Location - TC Systems Inc. - Hartwell Avenue

Award a Grant of Location to TC Systems, Inc., to construct, and a location for, such a line of conduits with the necessary wires and cables therein, to be located, from the Verizon System to...

Minutes, page 5

ApprovePassed · Unanimous, 5 present

VOTE: Upon motion duly made and by roll call, the Select Board voted 5-0 to award a Grant of Location to TC Systems, Inc., to construct, and a location for, such a line of conduits with the necessary wires and cables therein, to be located, from the Verizon System to riser poles as shown on plans entitled "Proposed Cable Placement Plan Lexington Overbuild Lexington, MA" dated June 30, 2025, prepared for TC Systems, Inc. by Siena Engineering Group, subject to any requirements from the Lexington Engineering Division and that any relocation subsequently required would be performed at no cost to the Town of Lexington.

From the minutes

“VOTE: Upon motion duly made and by roll call, the Select Board voted 5-0 to award a Grant of Location to TC Systems, Inc., to construct, and a location for, such a line of conduits with the necessary wires and cables therein, to be located, from the Verizon System to riser poles as shown on plans entitled "Proposed Cable Placement Plan Lexington Overbuild Lexington, MA" dated June 30, 2025, prepared for TC Systems, Inc. by Siena Engineering Group, subject to any requirements from the Lexington Engineering Division and that any relocation subsequently required would be performed at no cost to the Town of Lexington..”

Read it in the official minutes, page 5 (PDF)

ADJOURN

Adjourn

Minutes, page 6

ProceduralPassed · Unanimous, 5 present

VOTE: Upon a motion duly made and seconded, by roll call, the Select Board voted 5-0 to adjourn the meeting at 7:59p.m.

From the minutes

“VOTE: Upon a motion duly made and seconded, by roll call, the Select Board voted 5-0 to adjourn the meeting at 7:59p.m..”

Read it in the official minutes, page 6 (PDF)

From the Lexington Select Board’s official minutes, posted in the town’s Laserfiche records archive (Select Board minutes). We check every vote against the Select Board members present and quote the exact wording. MassVoter never grades or scores officials. Select Board photos: Town of Lexington (lexingtonma.gov), from the official Select Board page. Former members show initials.

How to read these pagesWhere the votes come from, how we check them against the official minutes, what isn't included yet, and how to report a mistake.About city pages →
Get an email when new quizzes open

MassVoter.com · nonpartisan match quiz · About · How the Legislature voted · Local Votes · Privacy · Support MassVoter

Report an error on this page

See something wrong? A wrong vote, name, date or number? Tell us and we’ll check it against the source and fix it. Fixes are listed on our corrections page.