MassVoter.com← Framingham City CouncilFramingham City Council · 2026–2027 Council · Regular meeting
6 recorded votes, 1 with disagreement.
Sources: Official minutes (PDF) · City meeting page
A monthly email on what it voted on, starting in November.
Your Framingham ballot: 13 quizzes, about a minute each.
Start my ballot →Present: George King, Noval Alexander, Michael Cannon, Mary Kate Feeney, Christine Long, Janet Leombruno, Leora Mallach, Philip Ottaviani, John Stefanini, Brandon Ward
Absent: Tracey Bryant
Open Public Hearing
To open the Public Hearing
“Moved by Michael Cannon; seconded by Janet Leombruno to Open Public Hearing . Motion Passed: 10- 0 Voting For: Noval Alexander, Michael Cannon, George King, Janet Leombruno, Christine Long, Leora Mallach, Philip Ottaviani, Brandon Ward, John Stefanini, Mary Kate Feeney Voting Against: None.” (Motion: Cannon, second: Leombruno)
Close Public Hearing
Close Public Hearing
“Moved by John Stefanini; seconded by Philip Ottaviani to Close Public Hearing . Motion Passed: 10- 0 Voting For: Noval Alexander, Michael Cannon, George King, Janet Leombruno, Christine Long, Leora Mallach, Philip Ottaviani, Brandon Ward, John Stefanini, Mary Kate Feeney Voting Against: None.” (Motion: Stefanini, second: Ottaviani)
Approve Second Reading That the City of Framingham hereby appropriates the amount of One Hundred and Twenty-Five Thousand ($125,000) Dollars for the purpose of paying feasibility study and...
Approve Second Reading That the City of Framingham hereby appropriates the amount of One Hundred and Twenty-Five Thousand ($125,000) Dollars for the purpose of paying feasibility study and schematic design costs related to a potential Accelerated Repair Project involving replacement of the roof at Brophy Elementary School located at 575 Pleasant Street and includes a building consisting of 66,000 square feet, plus over 2,000 square feet of modular space, and is situated on 28.13 acres of land with a playground, two baseball fields, a lacrosse field and a soccer field, and 80 vehicle-parking spaces, including the payment of all costs incidental or related thereto (the “Project”), which proposed repair project would materially extend the useful life of the school and preserve an asset that otherwise is capable of supporting the required educational program, and for which the City of Framingham has applied for a grant from the Massachusetts School Building Authority (the “MSBA”), said amount to be expended under the direction of Superintendent of Schools. To meet this appropriation, the Treasurer with the approval of the Mayor, is authorized to borrow said amount under M.G.L. Chapter 44, or any other enabling authority. The City of Framingham acknowledges that the MSBA’s grant program is a non-entitlement, discretionary program based on need, as determined by the MSBA, and if the MSBA’s Board of Directors votes to invite the City of Framingham to collaborate with the MSBA on thi
“Moved by Philip Ottaviani; seconded by Michael Cannon to Approve Second Reading That the City of Framingham hereby appropriates the amount of One Hundred and Twenty-Five Thousand ($125,000) Dollars for the purpose of paying feasibility study and schematic design costs related to a potential Accelerated Repair Project involving replacement of the roof at Brophy Elementary School located at 575 Pleasant Street and includes a building consisting of 66,000 square feet, plus over 2,000 square feet of modular space, and is situated on 28.13 acres of land with a playground, two baseball fields, a lacrosse field and a soccer field, and 80 vehicle-parking spaces, including the payment of all costs incidental or related thereto (the “Project”), which proposed repair project would materially extend the useful life of the school and preserve an asset that otherwise is capable of supporting the required educational program, and for which the City of Framingham has applied for a grant from the Massachusetts School Building Authority (the “MSBA”), said amount to be expended under the direction of Superintendent of Schools. To meet this appropriation, the Treasurer with the approval of the Mayor, is authorized to borrow said amount under M.G.L. Chapter 44, or any other enabling authority. The City of Framingham acknowledges that the MSBA’s grant program is a non-entitlement, discretionary program based on need, as determined by the MSBA, and if the MSBA’s Board of Directors votes to invite the City of Framingham to collaborate with the MSBA on this proposed repair project, any project costs the City of Framingham incurs in excess of any grant that may be approved by and received from the MSBA shall be the sole responsibility of the City of Framingham; and that, if invited to collaborate with the MSBA on the proposed repair project, the amount of borrowing authorized pursuant to this vote shall be reduced by any grant amount set forth in the Project Funding Agreement, or Feasibility Study Agreement if applicable, that may be executed between the City of Framingham and the MSBA. Further, that this order shall supersede a like amount of the appropriation and borrowing authorization loan order vote for this Project adopted by the City Council on June 27, 2023 as part of Loan Order #2023-042-002 (the “2023 Loan Order”) and any amounts already borrowed or encumbered under the 2023 Loan Order are hereby deemed to be borrowed and encumbered under this Loan Order.. Motion Passed: 10- 0 Voting For: Noval Alexander, Michael Cannon, George King, Janet Leombruno, Christine Long, Leora Mallach, Philip Ottaviani, Brandon Ward, John Stefanini, Mary Kate Feeney Voting Against: None.” (Motion: Ottaviani, second: Cannon)
Approve Second Reading That the City of Framingham hereby appropriates the amount of One Hundred and Twenty-Five Thousand ($125,000) Dollars for the purpose of paying feasibility study and...
Approve Second Reading That the City of Framingham hereby appropriates the amount of One Hundred and Twenty-Five Thousand ($125,000) Dollars for the purpose of paying feasibility study and schematic design costs related to a potential Accelerated Repair Project involving replacement of the roof at Potter Road Elementary School located at 492 Potter Road, with a building consisting of 63,600 square feet, located on 12.75 acres of land with a playground, baseball field, basketball courts, multipurpose field, and 80 vehicleparking spaces, including the payment of all costs incidental or related thereto (the “Project”), which proposed repair project would materially extend the useful life of the school and preserve an asset that otherwise is capable of supporting the required educational program, and for which the City of Framingham has applied for a grant from the Massachusetts School Building Authority (the “MSBA”), said amount to be expended under the direction of the Superintendent of Schools. To meet this appropriation, the Treasurer with the approval of the Mayor, is authorized to borrow said amount under M.G.L. Chapter 44, or any other enabling authority. The City of Framingham acknowledges that the MSBA’s grant program is a non-entitlement, discretionary program based on need, as determined by the MSBA, and if the MSBA’s Board of Directors votes to invite the City of Framingham to collaborate with the MSBA on this proposed repair project, any project costs the City of Fra
“Moved by Philip Ottaviani; seconded by Michael Cannon to Approve Second Reading That the City of Framingham hereby appropriates the amount of One Hundred and Twenty-Five Thousand ($125,000) Dollars for the purpose of paying feasibility study and schematic design costs related to a potential Accelerated Repair Project involving replacement of the roof at Potter Road Elementary School located at 492 Potter Road, with a building consisting of 63,600 square feet, located on 12.75 acres of land with a playground, baseball field, basketball courts, multipurpose field, and 80 vehicleparking spaces, including the payment of all costs incidental or related thereto (the “Project”), which proposed repair project would materially extend the useful life of the school and preserve an asset that otherwise is capable of supporting the required educational program, and for which the City of Framingham has applied for a grant from the Massachusetts School Building Authority (the “MSBA”), said amount to be expended under the direction of the Superintendent of Schools. To meet this appropriation, the Treasurer with the approval of the Mayor, is authorized to borrow said amount under M.G.L. Chapter 44, or any other enabling authority. The City of Framingham acknowledges that the MSBA’s grant program is a non-entitlement, discretionary program based on need, as determined by the MSBA, and if the MSBA’s Board of Directors votes to invite the City of Framingham to collaborate with the MSBA on this proposed repair project, any project costs the City of Framingham incurs in excess of any grant that may be approved by and received from the MSBA shall be the sole responsibility of the City of Framingham; and that, if invited to collaborate with the MSBA on the proposed repair project, the amount of borrowing authorized pursuant to this vote shall be reduced by any grant amount set forth in the Project Funding Agreement, or Feasibility Study Agreement if applicable, that may be executed between the City of Framingham and the MSBA. Further, that this order shall supersede a like amount of the appropriation and borrowing authorization loan order vote for this Project adopted by the City Council on June 27, 2023 as part of Loan Order #2023-042-002 (the “2023 Loan Order”) and any amounts already borrowed or encumbered under the 2023 Loan Order are hereby deemed to be borrowed and encumbered under this Loan Order.. Motion Passed: 10- 0 Voting For: Noval Alexander, Michael Cannon, George King, Janet Leombruno, Christine Long, Leora Mallach, Philip Ottaviani, Brandon Ward, John Stefanini, Mary Kate Feeney Voting Against: None.” (Motion: Ottaviani, second: Cannon)
Approve document FC Council Rules 2026 final as the Council Rules for the 2026-2027 session
To approve document FC Council Rules 2026 final as the Council Rules for the 2026-2027 session
The minutes give the count (10-0-0) without names; it equals the councilors present, so each is shown voting yes.
“A vote was taken and approved, 10-0-0..” (Motion: Stefanini, second: Leombruno)
Adjourn the meeting
To adjourn
“Moved by Michael Cannon; seconded by Janet Leombruno to Adjourn . Motion Passed: 10 - 0 Voting For: Noval Alexander, Michael Cannon, George King, Janet Leombruno, Christine Long, Leora Mallach, Philip Ottaviani, Brandon Ward, John Stefanini, Mary Kate Feeney Voting Against: None.” (Motion: Cannon, second: Leombruno)
From the Framingham City Council’s official minutes, posted on the city’s public meeting portal (linked from the Public Meeting Calendar on framinghamma.gov). We check every vote against the councilors present and quote the exact wording. MassVoter never grades or scores officials. Councilor photos: Framingham Patch (George King, Janet Leombruno, Christine Long, Michael Cannon, Noval Alexander, Philip Ottaviani, Leora Mallach, John Stefanini; candidate and courtesy photos), District2Framingham.com (Brandon Ward), Run for Something (Mary Kate Feeney) and Framingham SOURCE (Tracey Bryant, 2021 candidate Q&A, photo courtesy of the candidate). The city’s website has no councilor photos. Former councilors show initials.
How to read these pagesWhere the votes come from, how we check them against the official minutes, what isn't included yet, and how to report a mistake.About city pages →